Section 10 Wastewater Treatment Plant (REBID)
BID DATE
05/2/17 - 4:00
AGENCY
Bullhead
ESTIMATE
$200,000
SCOPE
ORG BID RESULTS: Technology Construction, Inc. - $713,200 Schofield Civil Construction - $869,500 The project consists of the construction and installation of effluent piping, valves, fittings and controls, packaged pump station, electrical conduit, wire, equipment and devices, and other appurtenances to provide a complete system for delivering treated wastewater effluent from the Section 10 WWTP to two new effluent injection wells located on site (which will be constructed by others), and then returning backflush water from the new wells to the existing tertiary filter backwash holding tank at the plant. The project will consist of furnishing all labor, materials, equipment, fixtures and services required to complete the work. This project is funded through the United States Department of the Interior, Bureau of Reclamation Pilot System Water Conservation Program and the Contractor shall comply with the requirements of that program. mcoronel@bullheadcity.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT