Access the Full Project by Clicking here!
Bidjugde
JOB
Tunnel Road Access Improvements Ashby Telegraph Intersection Improvements
BID DATE
12/22/16 - 2:00
AGENCY
Berkeley
ESTIMATE
$920,000
SCOPE
The work to be done along Tunnel Road consists of constructing bulb-outs, new concrete sidewalk, storm drainage modifications, traffic signal modifications, traffic striping and signing, traffic pavement markings, inductive loop detector installation, flashing beacons and accessible curb ramps. The work to be done at Ashby and Telegraph consists of traffic signal modifications. This work includes, but not limited to, the removal of existing conditions, saw-cutting, removal of existing pavement, curb, gutter, and sidewalk, as required, cleaning of street as necessary, repair of failed areas, leveling, asphalt concrete surfacing, adjusting to grade such City structures as are affected by the work, and traffic control. grubendall@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT