Access the Full Project by Clicking here!
Bidjugde
JOB
AWRF Grit System Permitting and Design
BID DATE
12/20/16 - 3:00 LIVE!
AGENCY
Chandler
ESTIMATE
$4,698,000
SCOPE
BIDS DUE 12/19, OPEN 12/20. Work under this contract includes: addition of Grit Removal Facilities at the Airport Water Reclamation Facility, and the new facilities consists of Grit Concentrators, Grit Pumps, Grit Washers/Classifiers and Grit Dewatering Conveyors; a pre-engineered metal building to house the Grit Washer/Classifiers and Grit Dewatering Conveyors and other ancillaries. Work includes modifications to the Pre- Stage Basin No. 1 Odor Control and associated piping changes, Pre-Stage Basin No. 2 Odor Control piping changes, concrete structures for Grit Concentrators, retaining wall and foundation slab for the Grit Dewatering Building, connections to existing facilities, yard piping modifications, relocation of existing utilities, electrical and instrumentation work, modifications to the existing FOXBORO DCS, miscellaneous site and grading work. Work also includes addition of Belt Filter Press Pump No. 8 and associated piping, electrical and programming modifications as outlined in the Contract Documents. Airport WRF is an end of the line facility and will continue to operate during construction, therefore, work includes extensive coordination with the existing treatment facilities operation (and work around) to complete the scope of the project.
PREBID
11/28/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT