2015 2016 Street Resurfacing
BID DATE
12/1/16 - 2:00
AGENCY
Stockton
ESTIMATE
n/a
SCOPE
This project is done in two phases. Phase I is done in the winter months of year 2017. The scope of work in Phase I includes extruded curbs, stamped concrete in median islands, ADA wheel chair ramps, trncated domes, two bus pads at BRT stops, removal and re-installation of curb, gutter, and sidewalk. Construction of Phase I is dependent on availability of funds with the City of Stockton. Phase II is done in the summer months of year 2017. Phase II scope of work includes base failure repairs, crack sealing, pavement patching/leeling, pavement grinding, installing electrical traffic detector loops and detector hand holes, 2 asphalt concrete overlay and striping. Omar.Al-hindi@stocktonca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT