Access the Full Project by Clicking here!
Bidjugde
JOB
2016 Sidewalk Repair
BID DATE
12/8/16 - 2:00
AGENCY
Paso Robles
ESTIMATE
n/a
SCOPE
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as 2016 Sidewalk Repair Project, DPW Project No. 16-08, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, sawcutting, removal and disposal of sections of existing PCC sidewalk, curb, gutter, driveway approaches, and asphalt concrete. Pruning and removal of tree roots. Placement, grading and compacting of class II base. Forming, pouring and finishing PCC sidewalk, curb, and gutter. Furnishing, placing, and compacting of hot mix asphalt pave-back areas, all as shown on the plans and/or as specified herein.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT