Access the Full Project by Clicking here!
Bidjugde
JOB
Eureka Waterfront Trail Phases B and C
BID DATE
12/6/16 - 2:00
AGENCY
Eureka
ESTIMATE
n/a
SCOPE
Construction of an approximately 2.55-mile long segment of Class 1 multi-use trail from Del Norte Street to C Street (Phase B) and Halvorsen Park Trail to Tydd Street (Phase C). The trail generally consists of a 10 foot (8 foot in some areas) paved section designed to accommodate pedestrians and at times emergency vehicles and two unpaved shoulders. The project also includes six aluminum bridges, a six hundred foot long aluminum boardwalk and trail amenities along the alignment.
PREBID
11/15/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT