Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Water Diverter Station Upgrades
BID DATE
12/8/16 - 2:00
AGENCY
Coronado
ESTIMATE
$170,000
SCOPE
This project generally consists of removing the existing diverter ball valve and actuator system and installing an automatic float valve at three site locations; modifications to the existing piping, concrete weirs and bottoms of the existing cleanout/inlet box; installation of trash grates and pipe filter fabric; a new concrete valve box cleanout; a new sewer lateral, camlock connection, and manhole; miscellaneous work for piping and valve appurtenances, and check valve installation. engineering@coronado.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT