Access the Full Project by Clicking here!
Bidjugde
JOB
North State Street Intersection Low Gap Road Brush Street Storm Drain
BID DATE
12/6/16 - 2:00
AGENCY
Ukiah
ESTIMATE
$1,396,558
SCOPE
The removal and abandonment of the existing storm drain inlets, structures, and storm drain piping and installing new drain inlet structures and storm drain piping as shown on the plans. Remove and reconstruct existing curb returns to new radii and grades, together with new sidewalk, driveways sections, ADA ramps, and new roadway section adjacent to the new curb and gutter as shown on the plans. Construct footing and relocated existing commercial sign. Remove and relocate existing traffic signal infrastructure effected by the new sidewalk construction, and install new traffic signal poles and light modules and shown on the plans, together with a video camera system, relocation or replacement of conduit, new pull boxes, and electrical wiring as needed, including temporary traffic control system and testing. Work to be suspended during winter months. PHASE 2 – Construction frontage improvements consisting of sidewalk and retaining walls on the south side of Brush Street, not including the curb return. The removal of the existing structural section of Brush Street not including the shoulder improvements adjacent to the sidewalk, install new structural section per the plan detail, remove and reconstruct the shoulders along North State Street north of the intersection, grind the existing asphalt in the North State Street north of the intersection and overlay, grind existing asphalt and overlay Low Gap Road as delineated on the plans. Mary Horger City of Ukiah 411 West Clay Street Ukiah, CA 95482 Tel:(707) 463-6233 Fax:(707) 463-6234 mhorger@cityofukiah.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT