Access the Full Project by Clicking here!
Bidjugde
JOB
Sonoqui Wash Channelization Phases IIIA-1 and IIIA-2
BID DATE
06/26/12 - 2:00 LIVE!
AGENCY
MCFCD
ESTIMATE
$7,500,000
SCOPE
The project includes excavation of a detention basin, channels, installation/construction of pipe culverts, catch basins, headwalls, wingwalls, transition structures, manholes, box culverts, riprap, rock mulch slope protection, paved or surfaced maintenance roads, relocations of water main, and nonirrigated landscaping utilizing hydroseed and tall pot trees.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT