Access the Full Project by Clicking here!
Bidjugde
JOB
Force Main West Section Replacement
BID DATE
11/3/16 - 2:00
AGENCY
Leucadia Wastewater District
ESTIMATE
n/a
SCOPE
Force Main West Section Replacement Project which includes all work, materials, labor, tools, services, and equipment necessary for the installation of approximately 2,540 linear feet of 24-inch PVC sewer force main and associated appurtenances and approximately 1,989 linear feet of cured-in-place-pipe (CIPP) lining in existing 10 gravity sewer. Project includes all saw cutting, dewatering, potholing of existing utilities, preparation of and adherence to water pollution control drawings, preparation of and adherence to traffic control drawings, abandonment and/or removal of existing 24 inch ductile iron force main, trenching, shoring, pipe, bedding, compaction, backfill, off-site disposal of all construction waste pursuant to applicable law, performing all connections between new pipeline and the existing system, completing all trench resurfacing and site restoration including pavement grinding and overlay; providing and installing CIPP liner including traffic control, sewer bypassing, trucked sewer bypassing

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT