Equity Center Site Work & Utilities
BID DATE
11/2/16 - 2:00
AGENCY
Mt San Antonio College
ESTIMATE
$700,000
SCOPE
Phase I – grade site and obtain certification on the modular building pad, install all utilities, block – wall utility, enclosure, walkways, ADA ramp, landscaping, irrigation, lighting. Phase 2 – Connect utilities to 7,600 sf modular facility, connect power to electrical panels, and install data wiring in IDF room and distribute to all faceplates. All work per plans & specs. Bid Alternate – Northeast corner of site – regrade, repave and add new trench storm drain, while installing utility connections to power and data as part of base scope.
PREBID
10/11/2016 10:30