Access the Full Project by Clicking here!
Bidjugde
JOB
Sweetwater Avenue Water Main Extension from 39th Ave to 51st Ave
BID DATE
11/15/16 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$2,235,188
SCOPE
The City of Phoenix is seeking a qualified contracting firm to perform the following Scope of Work: installation of 16-inch ductile iron water mains along Sweetwater Avenue between 39th Avenue through 51st avenue; installation of fire hydrants blow-off assemblies; adjusting existing storm drains and installation of manhole; encasing concrete sewer mains at certain area; connections to existing water services at 39th Avenue and 51st Avenue; connection to a new 5MGD PRV station at SWC of 43rd Avenue and Sweetwater (will be constructed by a City JOC contractor simultaneously); installation of cathodic protection system along the pipeline; removal & replacement of concrete curb, gutter, asphalt, landscaping, etc., as needed, to complete new main work, including application of micro seal on the ROW; and all other work as it relates to this project, including, but not limited to, preparation of waterline shut-down MOPOs, traffic control, construction survey, asbestos monitoring, coordination with the City JOC contractor, coordination with the Washington Elementary School District, and assistance with public outreach. A Small Business Enterprise goal of 8% has been established for this project. A pre-bid conference meeting will be held on Monday, October 24, 2016, at 10:30 a.m. local time, at Phoenix City Hall, 9th Floor, 9 Training Conference Room, located at 200 West Washington Street, Phoenix, AZ 85003. The Engineer’s Estimate for this project is $1,828,790 to $2,235,188. Please submit all questions related to this procurement by email to george.goodale@phoenix.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT