Access the Full Project by Clicking here!
Bidjugde
JOB
Carriage House Lift Station Rehabilitation
BID DATE
10/27/16 - 3:30
AGENCY
Grass Valley
ESTIMATE
$320,000
SCOPE
The scope of work, in general, involves the rehabilitation of the existing sewer lift station including, but not limited to: the coordination and installation of a new 400A panel with meter socket and main breaker panel, the temporary bypass of sewer flows, the demolition and removal of concrete, fencing, and various components of the lift station, the installation of a new foundation and lift station pad, pumps, valves, piping, hatches for the existing wet well and existing valve vault, a generator, block walls, chain link fencing, curb and gutter, and other related materials and labor necessary for the complete, tested, and operational installation of the sewer lift station. Other related items not mentioned above, that are required by the plans, specifications or these Special Provisions shall be performed, placed, constructed, or installed.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT