Ross Avenue Improvements
BID DATE
10/20/16 - 2:00
AGENCY
El Centro
ESTIMATE
n/a
SCOPE
This project involves cold milling existing street section to a depth of 2, crack sealing the existing roadway, adding a two and one half (2.5) inch asphalt leveling course, and one and one-half (1.5) inch ARHM at a two thousand seven hundred (2,700) foot portion of Ross Avenue between South Third Street and Fairfield Rd. in the City of El Centro, CA. The work also includes removing and replacing Portland Cement Concrete (PCC) ADA ramps and a portion of curb and gutter along with the double adjustment of existing water valves, sewer manholes and all appurtenant work as detailed in the plans and specifications. The completed portion of Ross Avenue will be restriped and signed per plan.