Access the Full Project by Clicking here!
Bidjugde
JOB
Tracks at Brea Segment 2 Segment 3 Restroom Plaza
BID DATE
11/14/16 - 2:00
AGENCY
Brea
ESTIMATE
$2,570,000
SCOPE
This project will involve the construction, soil remediation and grading of a multi-use trail that is approximately 1,300 linear feet in length consisting of a bike trail, stairs, bike trough, and a pedestrian path that is located in the formerly rail road property north of Birch St., between the Brea Canyon Flood Control Channel and Brea Blvd. Also, included in this project is the construction of a restroom and plaza facility in the formerly rail road property, located north of Birch St., between Brea Blvd. and State College Blvd. The construction includes but is not limited to the following: preparation and implementation of the SWPPP and WQMP measures, demolition, grading, soil remediation, drainage, signing, striping, placement of decomposed granite, asphalt concrete pavement, aggregate base, concrete curb and gutters, concrete sidewalks, fencing, storm drain, weed abatement, hydro-seeding, planting, irrigation, lighting infrastructure, site amenities, plant establishment and maintenance.
PREBID
10/20/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT