Sewer and AC Water Group 776
BID DATE
11/8/16 - 2:00
AGENCY
San Diego
ESTIMATE
$9,590,000
SCOPE
Construction of Sewer and AC Water Group 776 consists of furnishing all labor, materials, equipment, services, and construction of 15,333 LF of 8-inch, 1,696 LF of 10-inch, and 1,989 LF of 12-inch Sewer Main, 655 LF of 8-inch Sewer Main Rehabilitation, Sewer Manholes, Sewer Laterals, and 6,916 LF of 8-inch Water Mains, Fire Hydrants, Water Services, Trench Shoring, Traffic Control, Pavement Resurfacing, installation of new cleanouts, fire hydrants, curb ramps, replumb, abandonment of existing sewer and water mains, and all other work and appurtenances shown on these specifications and plans numbered 38320-01-D thru 38320-59-D, and 38320-T1-D through 38320-T23-D. Related work will include best management practices (BMPs) for erosion control and storm drain inlet protection, and restoration of disturbed areas to their original condition. Rosa Riego - 619-533-3426 rriego@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT