Access the Full Project by Clicking here!
Bidjugde
JOB
La Cholla Blvd: Magee Rd to Overton Rd
BID DATE
06/21/12 - 2:00 REAL-TIME
AGENCY
Pima County
ESTIMATE
$18,500,000
SCOPE
The work consists of constructing a four lane arterial roadway with a raised median along the La Cholla Boulevard alignment from just north of Magee Road to just north of Overton Road and two new six-span structures over the Cañada del Oro (CDO) Wash. The total length of La Cholla Boulevard to be built under this project is 1.7 miles. One major intersection to be reconstructed is at Overton Road. The work includes earthwork; constructing a storm drain systems; constructing concrete box culverts; building two similar six-span bridges; furnishing and placing aggregate base and asphaltic concrete; constructing concrete curb, concrete sidewalk, and concrete channel lining; furnishing and installing guard rail, pavement markings, traffic signals, irrigation, and plants; and related incidental work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT