Access the Full Project by Clicking here!
Bidjugde
JOB
Sycamore Road Storm Drainage Improvement (REBID)
BID DATE
04/11/17 - 3:00
AGENCY
Arvin
ESTIMATE
n/a
SCOPE
ORG BID RESULTS: Blois Construction - $4,689,715 Nicholas Construction - $4,837,303 Todd Companies (JT2 Inc) - $5,301,844 Cal Prime - $5,455,998 Floyd Johnston - $5,737,231 The primary work items are generally described as follows: 1. Construct storm drain pipeline along Comanche Drive, Sycamore Road, and Meyer Street, including manholes, inlets, connections with existing storm drains, control structures, and trench resurfacing. 2. Excavation of a new retention basin on Comanche Drive, south of El Camino Real. Stockpiling of excavated soil at approved site. Construct outlet structure, dry wells, fencing, and remove existing landowner irrigation facilities and install new irrigation facilities. 3. Reconstruct northern portion of Meyer Street and Sycamore Road intersection including the removal of the existing valley gutter, pavement, curb and gutter, and handicap ramp; grading of existing street, constructing A C pavement section, and constructing new ADA ramp

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT