Access the Full Project by Clicking here!
Bidjugde
JOB
Newport Road Street Resurfacing Bradley to Murrieta
BID DATE
10/13/16 - 11:00
AGENCY
Menifee
ESTIMATE
$975,000
SCOPE
The work generally consists of: 0”-2” header edge grind, crack filling of cracks 1/2" and wider, 1" min. AC leveling course followed by a 2" rubberized asphalt concrete overlay, detection loop replacement, installation of new bicycle loop detection, adjusting existing manholes and valves to grade and re-striping. Concrete repair work will include ADA ramp replacements, curb repairs, and cross gutter replacements. The project is about 1.0 miles of undivided arterial road. A mandatory pre-project meeting is scheduled for Oct 4, 2016 - 9:00 am
PREBID
10/4/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT