Winchester Pond Site Recovery Wells Phase 1
BID DATE
10/11/16 - 11:00
AGENCY
Eastern Municipal WD
ESTIMATE
$550,000
SCOPE
The work comprises construction of three (3) pilot recovery wells for the evaluation of recovering incidental recharge of recycled water that has reached the subsurface, A new 36- inch line connection between the 24-inch discharge and 48-inch main line, north of the existing 48-inch valve, and upsize the 12-inch connection (to 24-inch) between the 24-inch and 48-inch at Simpson Road to reduce head loss. callensj@emwd.org