E Beamer Trunk Sewer Lining
BID DATE
09/29/16 - 2:00
AGENCY
Woodland
ESTIMATE
$500,000
SCOPE
The project will rehabilitate approximately 1,300 feet of deteriorated 30-inch concrete sewer pipe through trenchless construction methods. The existing pipeline will be sliplined with a new 27-inch PVC pipe. A launching pit will be constructed at the approximate mid-span of the segment to push the new pipe in place. The pit will ultimately be backfilled and a new permanent manhole will be constructed in its place. The annular space between the new PVC pipe and existing concrete pipe will be filled with grout to lock the pipe in place. Sara Andreotti Sara.Andreotti@cityofwoodland.org