Access the Full Project by Clicking here!
Bidjugde
JOB
Conejo Creek North Park Waterline Replacement
BID DATE
09/14/16 - 3:30
AGENCY
Thousand Oaks
ESTIMATE
$150,000
SCOPE
The work consists of furnishing all labor, materials, tools, equipment and incidentals as required by the plans (Drawing Number: 16-06 A, Sheets 1 through 3), Specifications, and Contract Documents, The general items of work include, but are not limited to: replacement of approximately 363 feet of existing 16 inch steel water pipe with new 12 inch CML & C welded steel pipe including all associated joints, bends & fittings, saw cutting, pavement removal, excavation, trenching, shoring, welding, back filling, asphalt paving, installation of a reinforced concrete cap, removal and salvage of a 16 inch existing butterfly valve, furnish and installation of a 12 inch new butterfly valve, furnish and installation of a 4 inch blow off assembly, furnish and installation of 1 inch air release and vacuum valve assembly, pavement repair, re-installation of striping and pavement marking, removal and replacement of speed humps, per specifications Irina Savulescu Tel 805-449-2226 Fax 805-449-2250 isavulescu@toaks.org
PREBID
8/30/2016 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT