Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Performing Arts Center Parking Garage
BID DATE
12/14/16 - 9:00
AGENCY
Madison School District
ESTIMATE
$13,000,000
SCOPE
The Madison Elementary School District plans to construct a new Performing Arts Center that will serve the needs of all schools within the Madison ESD.  The conceptual floor plan is based on a 900 seat auditorium with an ample sized lobby to be used for pre-function activities, restrooms, a prep room for catered events, ticketing/will call, and office space. The control booth(s) will be housed within the auditorium envelope with state of the art theatrical rigging, sound system, and other AV needs to support the stage functions.  The back of house support space will primarily consist of restrooms, dressing and makeup rooms, storage, and multi-use space.  The existing District warehouse space (+/-6,100 SF) located with the District Office Building will provide the space needed for these back of house functions and therefore the design intent is to adjoin the new PAC to the existing District Office and utilize the warehouse space once that function is located off property.  The Performing Arts Center will be constructed in the existing west parking lot of the District Office. Approximate sf of new construction is 25,000. Included in this scope is a new four-story parking garage which will be constructed adjacent to the Performing Arts Center and serve all three facilities (the school, the District Office, and the new PAC).  The garage will be able to accommodate approximately 346 parking stalls. Contact Person: Valerie Gere Phone: 602-664-7990 Email: vgere@madisoned.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT