JOB
Shared Use Path El Rio to Avra Valley Road
BID DATE
09/9/16 - 2:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
BID DATE CHANGE PER AD 1. The work under this contract shall consist of furnishing all labor, equipment, and materials required to construct approximately 1.5 miles of new asphalt shared use path along the upper bank of the Santa Cruz River channel from El Rio Park northwest to Avra Valley Road. The project includes two Arizona Department of Transportation (ADOT) reinforced concrete box culverts, concrete dip crossings, signage and connections to existing facilities. The work, complete-in-place, includes, but is not necessarily limited to, salvage, demolition, disposal, excavation, backfill, grading, pavement placement, site restoration, traffic control (incidental to the work), quality control, and other related incidental work as shown on the associated plans.