Access the Full Project by Clicking here!
Bidjugde
JOB
I-8 Water Crossing Viewside Lane El Capitan Pipeline
BID DATE
09/13/16 - 2:00
AGENCY
Padre Dam Municipal WD
ESTIMATE
$14,000,000
SCOPE
The general scope of work includes construction of a 12 MGD potable water pump station, 1.75 MG prestressed concrete reservoir, flow control facility, approximately 6,000 LF of 20-inch CML&C welded steel pipe, and a tunnel crossing Interstate 8, an 8-inch CML&C welded steel pipe inside an existing 16-inch steel casing at Viewside Lane, and 36-inch CML&TC steel pipe at Woodside Avenue. The Engineer’s construction cost estimate is $14 million. ESASCP@padre.org
PREBID
8/16/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT