Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide ADA Ramps and Street Reconstruction Phase 3
BID DATE
09/13/16 - 2:00
AGENCY
Monterey
ESTIMATE
$2,000,000
SCOPE
In general, the work consists of, but is not limited to, the demolition and construction of concrete curb, gutter, cross gutter, sidewalk, curb ramps and driveways, storm drainage, signage and striping, isolated street surface repairs, pavement grinding, street reconstruction and Hot Mix Asphalt pavement. The work also consists of the removal and legal disposal of asphalt concrete pipe (ACP) storm drain. Rose Dickson City of Monterey Public Works/Engineering 353 Camino El Estero Monterey, CA 93940 Tel:(831) 646-3997 Fax:(831) 646-5686 dickson@monterey.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT