Access the Full Project by Clicking here!
Bidjugde
JOB
Patio Homes Neighborhood Street Resurfacing
BID DATE
08/30/16 - 11:00
AGENCY
Menifee
ESTIMATE
n/a
SCOPE
The work generally consists of but not limited to the following: 1. Protect existing storm drain inlets within the work area and those inlets downstream of the work area by implementing appropriate Best Management Practices. 2. Provide traffic Control. 3. Provide Public Notification and Project sign per Exhibit E. 4. Clear and grub existing surface of any organic material and loose debris prior to crack sealing and resurfacing. 5. Remove all existing thermoplastic striping and raised pavement markers within the work area. 6. Remove and properly dispose damaged areas of AC pavement as shown in Exhibit B – Project Detail Map, scarify top 12” of existing base and re-compact to 95%. Replace area with 4” min AC pavement. 7. Sawcut and properly remove and dispose existing concrete pedestrian ramps, curb and gutter and cross gutter were shown. 8. Install ADA compliant pedestrian ramps and replace concrete curb and gutter and cross gutters as shown in Exhibit C – Pedestrian Ramp Details. Contractor shall be responsible to meet all city and ADA standards and requirements. Pedestrian ramps not compliant to such standards and requirements shall be removed and replaced at no cost to the City. 9. Prior to street resurfacing, cover all existing manholes and valves in the work area. 10. Crack fill large traverse cracks as needed. 11. Apply a 5/16” aggregate (chips) over a Polymer Modified Rejuvenator Emulsion (PMRE) scrub seal where shown in Exhibit B – Project Detail Map. 12. Apply Type II-PM CQS-1h slurry seal over the entire work area. 13. Re-stripe existing road as shown in Exhibit B – Project Detail Map, all striping and pavement marking shall be thermoplastic. 14. Install blue dots at the location of all existing fire hydrants. A mandatory pre-project meeting is scheduled for Aug 23, 2016 - 9:00 am
PREBID
8/23/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT