South Long Beach Sewer Improvement
BID DATE
09/8/16 - 10:00
AGENCY
Long Beach
ESTIMATE
$1,563,000
SCOPE
The Work involves furnishing all labor, equipment and materials necessary to rehabilitate approximately 17,500 lineal feet of vitrified clay sewer pipe. The work includes, but is not limited to CCTV inspections, cleaning and lining 8-inch, 10-inch and 12-inch pipe, point repairs, removing and replacing sections of existing 8-inch sewers, restoring existing sewer laterals after repair/lining, root removal, installation of “top hat” repairs, and repair of intruding laterals, manhole channels and manhole rehabilitation. The work will require temporary sewer bypass facilities, traffic control, and potholing utilities. Jinny Huang - 562-570-2346 Jinny.Huang@lbwater.org