Access the Full Project by Clicking here!
Bidjugde
JOB
W Zone 16 Inch San Lucas Interconnect
BID DATE
08/25/16 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The work under this contract shall consist of furnishing all labor, equipment, and materials required to install 16-inch ductile iron water main and 32-inch steel casing in rights-of-way owned by Marana, Union Pacific Railroad (UPRR) and the Arizona Department of Transportation (ADOT). The work includes, but is not necessarily limited to pipeline installation, casing installation, boring, trenching, backfill, pavement replacement, site restoration, traffic control, quality control, and other related incidental work as shown on the associated plans. The work shall include completely and lawfully investigating, locating, documenting, and avoiding any existing underground facilities and utilities and aboveground site improvements that may interfere with the construction and/or installation of the designed improvements. In regard to those respective utility companies whose underground and/or aboveground facilities are present within the vicinity of the project, the Contractor is obligated to comply with all responsibilities and standards for notification of construction, excavation, protection, installation, and the like. In the event the Contractor causes damage to existing underground or aboveground utility systems, site improvements, appurtenances, and appliances, the Contractor, at its own expense, shall mitigate the effects of such damage and make necessary repairs to the affected facilities and property equal to or better than existed prior to the start of the work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT