(CMAR) Elliot District Park Improvements
BID DATE
11/30/16 - 7:00
AGENCY
Gilbert
ESTIMATE
$11,300,000
SCOPE
The work items to be addressed include, but are not limited to: 1. ADA compliant ramps and stairs in the clubhouse buildings. 2. Playground shade structure. 3. ADA compliant stadium stairs and handrails. 4. Depressed stairways - ADA compliance around the perimeter of the clubhouse buildings. 5. ADA compliant stairs and handrails at dugout stairways. 6. ADA compliant switchback walking surfaces. 7. ADA defined trip hazards in existing flatwork. 8. Plaza concrete flatwork, batting cage, subgrade and drainage. 9. Ball fields’ site grading and drainage. 10. Site retention pond erosion. 11. Grandstand storm water management, grading and drainage, slope erosion, grandstand wall corrosion and materials. 12. Ballpark netting support columns. 13. Parking lot subgrade, asphalt replacement and drainage. 14. Administrative and Clubhouse buildings, drainage, structural repairs, windows and doors, exterior stucco, roofing Contact Person: Brad Richards, PE - Project Manager Address: 90 East Civic Center Drive, Gilbert, AZ, 85296 Email: Bradley.Richards@GilbertAZ.gov
PREBID
8/17/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT