Ella Elementary 7th Avenue Olivehurst Avenue (REBID)
BID DATE
10/12/16 - 10:00
AGENCY
Yuba County
ESTIMATE
$1,230,000
SCOPE
The work in general consists of placing and/or replacing drain culverts and storm drains, placing curb, gutter, and sidewalk, and hot mix asphalt overlay, placing pavement reinforcing fabric, the placement of pavement striping along 7th. Avenue from Olivehurst Avenue to Powerline Road. Other such items or details not mentioned above that are required by the plans, Standard Specifications, or these Special Provisions, and as directed by the Engineer, shall be performed, placed, constructed or installed.