Access the Full Project by Clicking here!
Bidjugde
JOB
Steiger Hill Road Storm Damage Repair 2016
BID DATE
08/17/16 - 2:00
AGENCY
Solano County
ESTIMATE
$300,000
SCOPE
Three locations on Steiger Hill Road, between 0.04 to 0.3 miles south of Cantelow Road (see site map in project plans incorporated into these Special Provisions). The Contractor shall place plastic pipeliner and pressure grout in place at two existing culverts. The Contractor shall construct a gravity retaining block wall system, with foundation, and reconstruct slope with excavated material from site. The roadway will be reconstructed and include ditch expansion and improvements, construction of a rock lined ditch, asphalt concrete curb, and oversized drain to control and improve site drainage. Nick Burton (email address: nsburton@solanocounty.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT