Access the Full Project by Clicking here!
Bidjugde
JOB
Paris 2015 Resurfacing
BID DATE
09/1/16 - 2:00
AGENCY
Redlands
ESTIMATE
$8,500,000
SCOPE
The Work shall consist of resurfacing various streets throughout the City. Resurfacing methods include pulverization, grind & overlay, and rubberized slurry seal (type II). Asphalt overlay will be the conventional asphalt. All necessary striping will be replaced. The scope of work also includes removal and replacement of curb & gutter, cross-gutter and ADA ramps as necessary; protecting in place all existing utilities, trees, and public and private improvements; pavement striping and restriping; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Goutam Dobey - 909-798-7584 x2 gdobey@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT