Access the Full Project by Clicking here!
Bidjugde
JOB
Alarcon Street Improvements
BID DATE
10/20/16 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
BID DATE CHANGED. This project generally consists of the pulverization of the existing asphalt and aggregate base (to be left in place); removal of curb and gutter to replace with new curb and gutter; integration of bio basins and landscape areas; and repaving of street located on Alarcon Street between E. Sheldon Street and E. Gurley Street.
PREBID
8/9/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT