Access the Full Project by Clicking here!
Bidjugde
JOB
2016 Measure V Pavement Rehabilitation
BID DATE
08/16/16 - 2:00
AGENCY
Healdsburg
ESTIMATE
$1,750,000
SCOPE
The Project involves the rehabilitation of pavement throughout the City by first removing and replacing the entire pavement section in areas with pavement failure at select locations followed by a surface rehabilitation of the street section with the application of either a Cape seal (Polymer Modified Asphalt Rubber Chip Seal followed by a Microsurface) or Microsurfacing. This work will include traffic control, thermoplastic pavement markings/striping removal, cleaning and preparing all surfaces to be treated, crack filling, application of a fog seal coat, application of either a Capeseal or a Microsurface to the entire roadway section, and thermoplastic pavement re-marking/re-striping. The project also includes the replacement of damaged or failed sidewalks, curb and gutter, valley gutters, and other concrete structures at select locations along these road sections Jeremy Lapin, Senior Civil Engineer jlapin@ci.healdsburg.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT