Access the Full Project by Clicking here!
Bidjugde
JOB
Monrovia Renewal SW SE Street Improvements
BID DATE
08/23/16 - 2:00
AGENCY
Monrovia
ESTIMATE
$6,279,142
SCOPE
Demolition of: asphalt pavement, pulverization of pavement, saw cut concrete and asphalt, removal of: concrete curb and gutter, sidewalk, driveways, cross gutter, curb ramps, cold mill of AC pavement, AC pavement, and local depression. Construction of: AC pavement, concrete: curb and gutter, sidewalk, drive approach, curb ramp, cross gutter, longitudinal gutter, transitional curb, parkway drain, and local depression, cape seal, slurry seal, adjust utilities, adjust manholes, traffic control, SWPPP, erosion control, and public notification. aatkins@ci.monrovia.ca.us
PREBID
8/9/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT