This project generally consists of milling existing asphalt pavement and replacing with new asphalt pavement on selected streets as shown on the plans. The project includes crack sealing on an as needed basis, placement of pavement fabric, adjustment of utilities to finish grade and the restoration of traffic striping. The project includes curb, gutter, handicap ramps and valley gutter replacements. The project also includes the placement of Type III Microsurfacing and a cape seal consisting of rubberized chip seal topped off with Type II Slurry Seal. The project includes placement of Tire Rubber Modified Slurry Seal Coat.