Phase 2 Regional Transmission Main Segment A2
BID DATE
08/18/16 - 3:00
AGENCY
Fresno
ESTIMATE
$20,000,000
SCOPE
The City of Fresno is inviting bids from pre-qualified bidders for the construction of the Phase 2 Regional Transmission Main – Segment A2 Project in Fresno, California. Pre-qualified bidders are defined as those contractors who responded to and were deemed pre-qualified through the City of Fresno’s Request for Pre-Qualification Bid File No.3449 - 1 – General Contractors for Phase 2 Regional Transmission Main – Segment A1 Project. The work to be performed under the specifications for Bid File No.3450 includes the furnishing of labor, materials, equipment, and services for the construction of about four miles of welded steel pipeline ranging from 24-inches to 48-inches in diameter. The facilities to be constructed include, but are not limited to the following:• About 4 miles of 48- to 24-inch diameter steel pipe• Pipeline appurtenances (air valves, blowoff, access manways)• Cathodic protection system• Four tunneled crossings of major streets, railroads, or canals• Street paving• Traffic Control Laura Rapp - 559-621-1169 Laura.Rapp@Fresno.gov
PREBID
7/12/2016 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT