Access the Full Project by Clicking here!
Bidjugde
JOB
2016 Street Rehabilitation Park Avenue Kennedy
BID DATE
07/27/16 - 1:05
AGENCY
Capitola
ESTIMATE
$1,195,000
SCOPE
The work to be performed under this contract includes, but is not limited to: mobilization; traffic control and construction signage; traffic striping, traffic markings, and markers removal; slope grading and retaining wall (less than 3 feet high); over-excavation if required, conform grinding, removal of asphalt concrete (AC) and aggregate base (AB), placement of AB, hot mix asphalt (HMA) overlay; cold in-place recycling (CIR) and cold milling of asphalt pavement, construction of concrete curb ramps, spandrels, curb, and other concrete improvements as required; adjusting of utility features (e.g. water valve boxes, sanitary and storm drain manhole frame and covers); placement of thermoplastic traffic stripes, pavement markers, and thermoplastic pavement markings; storm drain improvements (storm drain inlet, storm drain pipe) and all other work as shown on the Plans and as described in the Caltrans Standard Specifications and these Special Provisions to provide a complete project.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT