Access the Full Project by Clicking here!
Bidjugde
JOB
Phase IV Roadway Improvements
BID DATE
07/28/16 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
n/a
SCOPE
TOTALS HERE...WE POSTED BASE +1&2 combs base 4,725,573 +1 2 6,223,189 +1 3 6,893,691 markham base 3,824,700 +1 2 5,064,300 +1 3 5,604,700 dcs base 3,536,267 +1 2 4,847,083 +1 3 5,388,788 Possible rebid of same type of project and name bid last year. original bids results here> Markham Contracting Co. - $3,281,900 Blucor - $3,285,000 Nesbitt - $3,428,728 DCS Contracting Inc. - $3,727,260 Ricor Inc. - $3,782,130 Standard Construction Co. Inc. - $4,062,340 Copernicus Drive (S860) – The Project consists of approximately 1,167 feet of two lane, full street surface improvements. Improvements include installation of sewer, potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, traffic signal conduit, street sleeves, entry monuments, landscaping, and irrigation. Improvements will also include demolition of pavement in Ray Road in order to tie in utilities and pavement from Copernicus Drive. 2. Point Twenty-Two Blvd Phase II and Phase III (S861) – The Project consists of approximately 5,960 feet of half street improvements with two lanes in one direction. Improvements include installation of sewer, potable water, storm drain, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, entry monument, landscaping, and irrigation. 3. Everton Terrace (S862) – The Project consists of approximately 1,300 feet of two lane, full street surface improvements. Improvements include installation of sewer, potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, entry monument, landscaping, and irrigation. Improvements will also include demolition of pavement in Point Twenty Two Blvd in order to tie in utilities and pavement from Everton Terrace. 4. Parc Joule (S863) – The Project consists of approximately 1,226 feet of two lane, full street surface improvements. Improvements include installation of sewer, potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, entry monuments, landscaping, and irrigation. 5. Signal Butte Road (S864) – The Project consists of approximately 2,936 feet of half street improvements. Improvements include two lanes in one direction, potable water, storm drain, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, landscaping, and irrigation.
PREBID
7/18/2016 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT