Access the Full Project by Clicking here!
Bidjugde
JOB
Permanente Creek Flood Protection Rancho San Antonio
BID DATE
09/14/16 - 2:00
AGENCY
Santa Clara Valley WD
ESTIMATE
$19,000,000
SCOPE
Installation of temporary pedestrian detours, including all materials, concrete, fencing, signage, as required to safely detour pedestrians as required to complete work; 2. Clearing and grubbing of the project limits, including removal of existing trees; 3. Excavation of approximately 200,000 cubic yards of material to construct two detention basins at Rancho San Antonio Park; one on each side of Permanente Creek; Removal of the existing Permanente Creek concrete box culvert and construct a new concrete box culvert and wing walls beneath the Gate of Heaven Cemetery maintenance access road; 5. Construction of a new concrete flood control structure adjacent to the new concrete box culvert; 6. Installation of a concrete impact stilling basin inside the new north detention basin; 7. Installation of storm drains and their outfall structures; 8. Relocation of car and equestrian parking lot; 9. Design and construction of a new restroom at the new parking lot; 10. Installation of on-site wastewater system 11. Construction of asphalt concrete access roads and realign existing trails; 12. Installation of new irrigation well to serve the Gate of Heaven Cemetery with 6ft chain link fencing; 13. Abandonment and removal of existing irrigation well; 14. Installation of approximately 160 cubic yards of armoring aggregate for the maintenance roads and ramps; 15. Installation of various concrete driveways, walkways, valley gutter, and curb and gutters; 16. Installation of approximately 4000 linear feet of wood fencing, including relocated wood fencing; Relocation of one locking swing gate; 19. Removal and legal disposal of all structures, including abandoned asphalt concrete streets and concrete sidewalks, abandoned utilities, such as storm drains and storm drainage structures, waterlines, sewer lines, etc., and miscellaneous items as shown; 20. Coordination of work activities with various utility companies as needed to protect or arrange relocation of their facilities; 21. Installation of mitigation plantings; scvwdplanroom@valleywater.org.
PREBID
7/13/2016 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT