Access the Full Project by Clicking here!
Bidjugde
JOB
Tangerine Downtown Sewer Conveyance System - Phase II
BID DATE
07/26/16 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The work under this contract shall consist of furnishing all labor, equipment, and materials needed to construct a sanitary sewer line from the upstream end of the currently unused gravity sewer main that terminates near the Rillito Village Trail/I-10 Frontage Road Intersection to the existing Saguaro Bloom lift station near the Portland Avenue/Lambert Lane Intersection. This pipe run of approximately 8,755 lineal feet includes 2,219 lineal feet of 15-inch gravity sewer main and 6,536 lineal feet of 8-inch force main including 1,939 lineal feet encased in a 14-inch steel casing crossing underneath the Santa Cruz River. The scope of work as defined in the associated plans and/or described in the specifications includes, but is not necessarily limited to, trenching, backfill, and grading; horizontal directional drilling; installation of pipe, manholes, air release valves, and test stations; protection of and/or modifications to existing agricultural irrigation system facilities; removal and replacement of asphalt pavement; quality control; traffic control; storm water pollution protection; site restoration, and other related work. The work also includes mechanical, electrical, and instrumentation system modifications and improvements to the existing lift station and force main servicing the Saguaro Bloom residential subdivision currently being operated by the Pima County Regional Wastewater Reclamation District and the Rillito Vista Wastewater Treatment Facility for the purpose of connecting these facilities to the Town of Marana sewer conveyance system.
PREBID
7/7/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT