Santa Maria Park & Ride Lot Stabilization
BID DATE
07/12/16 - 2:00
AGENCY
Orinda
ESTIMATE
n/a
SCOPE
The work to be done generally consists of stabilizing a portion of the Park & Ride Parking Lot on Santa Maria Way by installing 2 diameter CIDH Stabilization Piles, replacing existing curb with new curb & gutter, replacing existing HMA pavement and installing new storm drain, all along the edge of the parking lot that is receding down an existing slope. The work also includes Additive Alternate work which provides ADA compliant parking and sidewalk in the southern corner of the parking lot. This work includes HMA pavement section replacement, signing, striping, and concrete flatwork. Kelli Capka at 925-253-4251 or kcapka@cityoforinda.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT