Access the Full Project by Clicking here!
Bidjugde
JOB
Ball Road Rehabilitation
BID DATE
07/14/16 - 2:00
AGENCY
Anaheim
ESTIMATE
$600,000
SCOPE
The work to be performed under this contract generally consists of rehabilitating the pavement within the existing right of way. The work to be undertaken consists of cold milling existing pavement and reconstructing with asphalt concrete pavement. The work includes removal and reconstruction of handicap access ramps. The work also includes the adjustment of traffic signal/ relocate traffic signal pull box and pedestrian crossing button post and coordination of adjustment of utility structures with utility purveyor, replacement of traffic striping, traffic detector loops and all appurtenant work thereto necessary for the proper construction of the proposed improvements Cesar Carrillo 714-765-5175 ccarrillo@anaheim.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT