Orange County Feeder Extension Relining Reach 1
BID DATE
10/5/16 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$3,900,000
SCOPE
The project consists of removal of the existing coal tar enamel (CTE) lining of approximately 2 miles of the 36-inch inside diameter Orange County Feeder Extension, installation of cement mortar lining, pit excavations, removal of portions of the existing pipeline and manhole structures, installation of new pipe and manhole structures, welding of butt straps at pipe joints, installation of air release and vacuum valves, pipe disinfection, and other appurtenant work as specified and shown on the drawings. SpecsDesk 213-217-6515 specsdesk@mwdh2o.com
PREBID
7/6/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT