Access the Full Project by Clicking here!
Bidjugde
JOB
Temporary Bridges Arroyo Seco Canyon
BID DATE
07/20/16 - 11:00
AGENCY
Pasadena
ESTIMATE
$370,049
SCOPE
These Specifications are for the furnishing of all supervision, labor, equipment, and materials necessary to perform the temporary structures construction at Arroyo Seco Canyon for the City of Pasadena, as required by the Water Division of the Water and Power Department. The work shall include the construction of two temporary bridges referred to as Bridges 1 and 3, installation of K-rail at Bridge 2, and the construction of a steel guardrail at Bridge 1.The project is located on the Gabrielino Trail in the Arroyo Seco Canyon. Bridge 1 is a culvert-type bridge over the Millard Creek; Bridge 2 is a historical concrete arch bridge over the Arroyo Seco Creek; and Bridge 3 is a historical A-frame timber bridge crossing over the Arroyo Seco Creek. These bridges are owned by the City of Pasadena and are under the jurisdiction and authority of the City’s Water and Power Department. The proposed temporary bridge structures will support the construction equipment that will travel to work areas of the City’s upcoming Arroyo Seco Canyon Project. Michael Tse - 626-744-7603 mitse@cityofpasadena.net
PREBID
7/11/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT