2016 Street Overlay
BID DATE
07/27/16 - 2:00
AGENCY
Sacramento
ESTIMATE
$825,200
SCOPE
The work to be performed under these Special Provisions consists of resurfacing the following street segments:• Northgate Boulevard between West El Camino Avenue south to Del Paso BoulevardResurfacing treatments include the placement of Hot Mix Asphalt (HMA) overlays. Other work includes: pavement planing; base repair; adjusting manholes and valve boxes to grade; installing traffic signal video detection cameras; replacing existing traffic signal detector loops; and placing new signing and striping.