JOB
Reconstruction of Restaurant Apron
BID DATE
09/9/16 - 5:00
AGENCY
Tucson Airport Authority
ESTIMATE
n/a
SCOPE
RESULTS RELEASED 8/19 PER REP. Ryan Airfield’s Restaurant Apron serves as the main parking area for General Aviation aircraft. Recent airfield pavement evaluation reports noted that the pavement be considered for reconstruction. This project will design and reconstruct the Restaurant Apron with new asphalt pavement and reconstruct the aircraft fueling pad, including installation of pavement marking. Associated with this project is to construct an American with Disabilities Act (ADA) ramp access to the Ryan Administration Building. Major elements of work include the following: demolition and removal of existing asphalt pavement on the Restaurant Apron and removal of Portland Concrete Cement Pavement (PCCP) at the aircraft fueling pad. Unclassified excavation, drainage and embankment, lime treatment of subgrade and installation of aggregate base course. Construction of new asphalt pavement apron and PCCP aircraft fueling pad and installation of aircraft tiedowns. Construction of new ADA ramp access to the Ryan Administration Building with modification of existing steel railing. Obliteration of existing markings and installation of new pavement markings. sgranillo@flytucson.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT