Winslow Wastewater Treatment Plant Phase II Upgrades (REBID)
BID DATE
11/17/16 - 2:00
AGENCY
Winslow
ESTIMATE
n/a
SCOPE
ORG BID RESULTS> Technology Construction, Inc. - $7,367,431 PCL Construction - AZ - $8,316,111 Mortenson - $8,571,804 RMCI Inc - $9,235,611 The Project consists of constructing modifications and improvements to the existing City of Winslow 2.2 MGD Wastewater Treatment Plant. The modifications and improvements shall include, but are not limited to include civil, architectural, mechanical, structural, and electrical and control works shown in the construction documents. Major components include: structural rehab of existing manholes, installation of new lift station, modifications to existing 0.5 MGD Flow Equalization Basin (FEB), installation of new structural FEB Pump Station vault, construction of a new Blower/Aeration Supply Building, installation of new Owner pre-selected equipment (fine bubble diffusers, high efficiency blowers, headworks system, construction of two new 60-ft diameter reinforced concrete secondary clarifiers), and construction of concrete slabs and foundations for equipment and process tanks.
PREBID
10/27/2016 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT