JOB
Lambert Lane Phase II Rancho Sonora La Canada Drive Water Main Replacements
BID DATE
08/17/16 - 1:30
AGENCY
Oro Valley
ESTIMATE
$8,000,000
SCOPE
The project consists of widening Lambert to a 4-lane divided roadway and replacing water main lines. The roadway work includes furnishing all labor, materials, and equipment necessary to reconstruct the existing 2-lane roadway into a 4-lane roadway section and includes slope stabilization, cross drainage facilities, storm drain, irrigated landscaping, striping, and signing, medians, sidewalk, multiuse path, and installation of public art. The water main replacements include the installation of an 8-inch and 12-inch water lines and other connections and appurtenances. Mark Neihart (520) 229-4722 mneihart@orovalleyaz.gov